Sunday, February 1, 2026
Home Tags Beetaloo Sub-basin

Tag: Beetaloo Sub-basin

NT allocates $2M annually to drive job opportunities in Beetaloo gas industry

The Northern Territory Government has unveiled a significant annual investment of $2 million in the 2024 Budget to catalyse job creation within the territory’s gas sector.

CSIRO vets mitigation, offset options for onshore gas produced in NT

CSIRO has published a report outlining options to mitigate and offset greenhouse gas emissions associated with the potential production and consumption of gas sourced from the Northern Territory’s Beetaloo Sub-basin. 
Advertisement

Reel Tech

Manson Industrial

Fanmaster

Featured Article

Reducing downtime through real-time shop floor insights with Minitab’s Prolink

Unplanned downtime remains one of the most costly – and often misunderstood – challenges on the manufacturing floor.