Friday, January 30, 2026
Home Tags Collie Battery Stage 2

Tag: Collie Battery Stage 2

CIMIC’s UGL wins contract for Neoen’s Collie Battery Stage 2

UGL, a member of the CIMIC Group, has secured a contract from Neoen, a client with whom it has a longstanding relationship, to build and set up the 341 MW / 1363 MWh Collie Battery Stage 2 in Western Australia.
Advertisement

Reel Tech

Manson Industrial

Fanmaster

Featured Article

Reducing downtime through real-time shop floor insights with Minitab’s Prolink

Unplanned downtime remains one of the most costly – and often misunderstood – challenges on the manufacturing floor.