Saturday, July 27, 2024
Home Tags Darwin Ship Lift

Tag: Darwin Ship Lift

NT gov’t grants ship lift construction contract to Clough-BMD

The Northern Territory government announced that it has awarded the head construction contract for the Ship Lift Facility to the Clough-BMD Joint Venture.
Advertisement

FabreLEC

Custom Patches Iraq

Featured Article

Beyond insights: CRM’s transformative role in sustainable manufacturing

Manufacturing companies worldwide are increasingly gearing up for a significant transformation with environmental sustainability at the centre. This comes amid stronger environmental regulations, a shift in consumer behaviour, and the industrial sector delves deeper into Industry 4.0.